<BGSOUND src="\Sound\sgamerica.mp3" LOOP=INFINITE>
View the Cost Summary
Community
Piet Directory
West Coast Piet
General Information
EAA
Sport Pilot
My Project
Cost Summary
Inspiration
Mike Cuy's Video
Flying NX770CG
Theodore Roosevelt Quote
Beautiful Piets
G-BXZ0
G-BXZ0
G-BUC0
G-BUC0
G-ECVB
G-ECVB
83
Rib #15 Side A Done12/28/2006
 Cut all pieces for #15 and T-88'd the gussets to side A. Slow and steady wins the race... I have the slow part down.
Man hours: 2
82
Harris "Aviator" Welding Outfit12/28/2006
 Santa came dressed as a UPS guy this year. ...and made me sign for my present. In the package were 12' hoses, flashback arrestors, regulators, tips 0, 1 and 2 and the Harris Model 15 torch handle. They even threw in a striker. Son provided goggles, tip cleaners and a brush. All I need now are the tanks and some gas. ...and a metal cutting bandsaw.
 
Harris Torches Miscellaneous $368.00
81
Test Fitting Parts12/27/2006
 I got the steamer going and fired up the heater in the shed. While waiting I decided to slip a few rips on a piece of spar and see how well the ribs fit. It suddenly struck me that I had made progress and soon I will have a wing. It's always satisfying to see progress.
Man hours: 0.5
 
80
Rib #14 Done12/27/2006
 Back-gusseted #14, then steamed #16 and placed in the bending jig. The top of #15 is in the jig ready for the bottom and internal braces.

One thing I noted when I put 5 ribs on a 6 foot spar section was how light it all was. Hard to believe it's strong enough to hold up a 600+ lb. plane.


Man hours: 1.5
79
Rib #14 Gussets on Christmas Eve12/24/2006
 Spent an hour out in the shop with my son to keep me company whilst applying the first side of gussets.
Man hours: 1
78
Rib 1412/22/2006
 Cut all pieces for #14 and steamed the top capstrip for #15. No gussets tonight. That will have to wait until tomorrow.
Man hours: 1.5
77
Rib #13 Done12/20/2006
 Glued the gussets on the back of the rib. While working on the gussets I steamed up a capstrip for tomorrow. It's 33 degrees out in the shed, 70 with the heater going. T-88 sets up overnight at 77 degrees so this could get expensive with kerosene at $2.80 a gallon.
Man hours: 1
76
Minor Jig Adjustment and Rib 13 Started12/3/2006
 Added some guides made from 1 inch pieces of capstrip. This should speed up the process and improve accuracy. Once the jig was set I immediately put together the first side of rib #13.
Man hours: 4
<< More Recent12345678910111213141516171819202122232425262728Less Recent >>

Page viewed 126317 times.

 : Glenn W. Thomas - Email - (860) 966-2856 - 49 Lynwood Road Storrs, CT 06268
Site Home