Project Cost Summary

  Building Materials Organizational Fees Non-Matl Project Expenses Miscellaneous
EAA Membership $40.00  
Full Size Rib Plan  $16.50 
Original Plans and Drawings Set  $148.00 
Original Builder's Manual  $29.70 
Shipping (Pietenpol Plans)  $13.00 
Corvair Conversion Manual  $59.00 
Pietenpol List Server $20.00  
"Welder's Handbook"  $18.95 
"Aircraft Welding"  $11.95 
Flying NX770CG   $20.00
Vent Pipe and Hardware$21.00   
Wood $15.00   
Pine (3"x3/4")$14.00   
Wing Wood$350.00   
Hot Plate w/Shipping  $25.00 
Tony Bingelis 4 Book Set  $90.00 
Advisory Circular 43.13 w/Shipping  $27.00 
Hardware$25.00   
T-88, Ply and 1/2" sq. Capstrip$51.00   
Aircraft Spruce and Supply Order Shipping$22.00   
Harris Torches   $368.00
Harbor Freight Metal Bandsaw  $191.98 
SUBTOTALS: $498.00 $60.00 $631.08 $388.00
GRAND TOTAL: $1,577.08      